Installation of replacement private potable water main at Trewassick, Newquay

Aqua Source SW have used a chain trencher to lay 1200meters of 32mm MDPE pipe, bedded in sand with tracer marker tape. The replacement pipeline crossed a number of hedges which we used a mole to tunnel under and thus reduce hedge disturbance. Aqua Source SW replaced all meters and stop valves to the individual properties so as to ensure all previous leaks on the existing main were eradicated.