Drilling Ground Source Holes in St Mawes’ Sunshine
Drilling for a Ground Source project in St Mawes, Cornwall. Four holes to 135m depth with 40mm loops and geothermal grout.
Because of our mining and engineering background, Aquasource (SW) Ltd. have a wealth of expertise and experience in dealing with Cornwall’s mining legacy.
Services include:
We will work with local engineers and architects to ensure the most cost effective solution for your mining problem.
We have extensive experience of working within or adjacent to World Heritage Sites and/or areas of great ecological or archaeological significance.
If required, we will liaise with all relevant statutory bodies to agree an acceptable method and scheme of work before and during works on site.
Drilling for a Ground Source project in St Mawes, Cornwall. Four holes to 135m depth with 40mm loops and geothermal grout.
You must be logged in to post a comment.